Home / Concrete & Site Work

OK FW TSM 10(1) NFH Entrance Road and Parking Improvements

Due: 20 days leftSolicitationSmall businessOK
What: Road and parking improvements at Tishomingo National Fish Hatchery. Full depth asphalt reclamation (6,800 sq yd), new asphalt paving (1,250 tons), roadway excavation (400 cu yd), new parking area, ABA-compliant curb ramp and parking spot, culvert replacement, two entrance gates, concrete aprons. Entrance roads and parking closed during construction. Buyer: Federal Highway Administration Where: Tishomingo, Oklahoma (approximately 8 miles northwest of Town of Tishomingo) Deadline: November 12, 2026 Who can bid: Any business registered in SAM.gov that qualifies as "small" under the size standard for NAICS code 237310. No SBA certification required. Key requirements: Not stated in the notice summary Check before bidding: (1) Full statement of work and contract terms in attachments; (2) Bonding and insurance requirements, wage rates, and schedule Next step: Register in SAM.gov if not already registered, then download bid documents and submit bid by November 12, 2026 at 4 p.m. ET.
Buyer
FEDERAL HIGHWAY ADMINISTRATION
Place of performance
Tishomingo, OK, 73460
Response deadline
Thursday, November 12, 2026 at 4:00 PM ET
NAICS code
237310
Contracting contact
Eric Grosskreuz · cflcontracts@dot.gov

Original description

PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD