Home / General Construction

Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)

Due: 40 days leftSolicitationSDVOSBCNC
What: Replace domestic water, chilled water, and steam piping in Buildings 1 and 23 at Durham VA Health Care Center. Work includes all materials, labor, equipment, testing, and storage. Project must be completed within 603 calendar days from start date, including procurement of long lead-time items. Work is phased to minimize disruption to the operating 24-hour medical facility. Buyer: Department of Veterans Affairs Where: Durham VA Health Care Center, 508 Fulton Street, Durham, NC Deadline: December 2, 2026 Who can bid: Only Service-Disabled Veteran-Owned Small Businesses certified by the SBA through VetCert are eligible to bid. Key requirements: Superintendent must provide both superintendent and quality control duties. Safety officer must be separate. All work performed per attached drawings and specifications. Personal protective equipment and infection control measures required. Not stated: specific bonding, insurance, or wage determination details. Check before bidding: Full drawings and specifications (attachments); specific bonding and insurance requirements; site visit requirements and dates. Next step: Obtain full solicitation documents and attachments. Confirm your SBA VetCert certification is current. Submit bid by December 2, 2026 at 2:00 PM UTC.
Buyer
VETERANS AFFAIRS, DEPARTMENT OF
Place of performance
Durham, NC, 27705
Response deadline
Wednesday, December 2, 2026 at 9:00 AM ET
NAICS code
236220
Contracting contact
Alice Custis · alice.custis@va.gov

Original description

Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General : The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate. Place of Performance : Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance : Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.