Home / General Construction

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Due: 28 days leftSolicitationOpen to allCT
What: Demolition of existing chilled water plant (Building 16a) and construction of new multi-story chilled water plant with chillers, cooling towers, pumps, mechanical and electrical equipment. New fuel tank farm construction. Replacement and upgrade of fire protection and domestic water mains from Campbell Avenue to Building 15. Installation of utility main loops (chilled water, steam, condensate, domestic water, fire protection) from new plant to Building 1. Redundant electrical feeder from utility demarcation to Building 19. New water storage tanks. Work includes civil, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. Must meet DVA Physical Security Resiliency Design Requirements and USGBC LEED Silver certification. Work performed at active medical center. Buyer: Department of the Army Where: West Haven, Connecticut Deadline: November 20, 2026 Who can bid: Full and open competition. Any responsible business may bid, including large businesses. Key requirements: Not stated in the notice summary Check before bidding: (1) Complete statement of work and technical specifications in attachments; (2) Schedule of performance, bonding requirements, insurance requirements, and any prevailing wage determinations Next step: Obtain the full solicitation documents and attachments from the government contracting office, then prepare and submit your bid by November 20, 2026.
Buyer
DEPT OF THE ARMY
Place of performance
West Haven, CT
Response deadline
Friday, November 20, 2026 at 1:00 PM ET
NAICS code
236220
Contracting contact
Tyler Maryak · tyler.s.maryak@usace.army.mil

Original description

The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.