Home / General Construction

Market Intelligence for EIE483 and EIE484

Due: 6 days leftSources SoughtOpen to allAK
What: Two military construction projects at Eielson AFB: (1) Joint Mobility Center Expansion—design and construct a Deployment Processing Facility, approximately $249.2 million, FY27–FY31; (2) 225-Bed Permanent Party Dormitory—construct a 3-story dormitory with 225 units, parking, utilities, approximately $305 million, FY27–FY31. This is market research only; no contract is being awarded now. Buyer: U.S. Army Corps of Engineers, Alaska District Where: Eielson Air Force Base, Alaska Deadline: October 29, 2026 to respond to this market intelligence request Who can bid: Any responsible business may respond, including large companies and small businesses. There is no small-business set-aside. Key requirements: Not stated in the notice summary Check before bidding: (1) Full scope of work, detailed technical specifications, and statement of work for both projects; (2) Specific terms and conditions of the Other Transaction Agreement, delivery method (Progressive Design-Build or CMAR), and evaluation criteria for Phase 1 and Phase 2 Next step: Download the Market Intelligence Questionnaire (pdf attachment) and email your completed response to Mark Corn, Kim Tripp, Theresa Afrank, and Jennifer Gosh by 2:00 PM Alaska Time on October 29, 2026.
Buyer
DEPT OF THE ARMY
Place of performance
Eielson AFB, AK, 99702
Response deadline
Thursday, October 29, 2026 at 6:00 PM ET
NAICS code
236220
Contracting contact
Mark Corn · mark.r.corn@usace.army.mil

Original description

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Codes: EIE483 and EIE484 - 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million The U.S. Army Corps of Engineers (USACE), Alaska District, has requirements for two separate Military Construction (MILCON) projects at Eielson Air Force Base, Alaska: EIE483 – Joint Mobility Center Expansion: Design and construct a new Deployment Processing Facility sited relative to the airfield and supporting facilities to be occupied by 354th Logistics Readiness Squadron personnel. The facility will contain areas for the Personnel Deployment Function, Cargo Deployment Function, and Deployment Control Center, plus building support spaces. The Personnel Deployment Function area will contain a non-sterile holding area for processing passengers, a manifesting office for weighing passengers with their gear, a sterile holding area for passengers who have been manifested and are awaiting mission briefing, and a second sterile holding area for mission briefings. The current schedule identifies design starting in FY27 and construction starting in FY29, with a period of performance from FY27 through FY31. EIE484 – 225-Bed Permanent Party Dormitory: Construct a 3-story permanent party dormitory to house 225 unaccompanied enlisted airmen. Construction will include slab-on-grade and steel frame with concrete masonry unit block veneer and insulated metal panel over metal studs at exterior walls. Supporting facilities include 200 parking spaces, extension of steam, water, and sewer utilities, power distribution, and land scaping to service the new facility. Main facility spaces include 225 dormitory units, activity space, communal kitchens, dorm management office, public restroom, laundry, theater/meeting space, elevator, and mechanical/utility space. The current schedule identifies design starting in FY27 and construction start in FY28, with a period of performance from FY27 through FY31. Estimated Acquisition Magnitudes: EIE483 – Joint Mobility Center Expansion: Approximately $249.2 million