Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
- Buyer
- VETERANS AFFAIRS, DEPARTMENT OF
- Place of performance
- Mather, CA
- Response deadline
- Thursday, November 12, 2026 at 3:00 PM ET
- NAICS code
- 236220
- Contracting contact
- Kayla A Haruguchi · kayla.haruguchi@va.gov
Original description
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel. Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local