Home / Concrete & Site Work

WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs

Due: 12 days leftSources SoughtOpen to allWY
What: Bridge repairs (concrete spall, crack, delamination, patch repairs), waterproofing membrane on deck, temporary debris shield, bridge approach reconstruction, drainage improvements, signing, guardrail replacement. Estimated cost $2,000,000–$5,000,000. Construction: 120 days, April–October 2027. Buyer: Federal Highway Administration Where: Hayden Arch Bridge, Hayden Arch Road, approximately 5 miles west of Cody, Wyoming Deadline: November 4, 2026 (5:00 p.m. UTC). This is the deadline to respond to this market research notice, not to submit a bid. Who can bid: Any responsible business may bid, including large companies. This is full and open competition with no set-aside. Key requirements: Bonding letter for $5 million single-project capacity and aggregate capacity. Past performance: list of road construction projects of equal or greater value showing bridge approach reconstruction, drainage improvements, signing, and guardrail replacement, plus the specific bridge repairs listed above. Certification in SAM.gov required. Check before bidding: Full scope of work and specifications (not in this summary). Site visit requirements and dates. Next step: Email CFLContracts@dot.gov (Laura Slauter) stating intent to bid as prime contractor, socioeconomic certifications, bonding letter, and past-performance project list by deadline.
Buyer
FEDERAL HIGHWAY ADMINISTRATION
Place of performance
Cody, WY, 82414
Response deadline
Wednesday, November 4, 2026 at 4:00 PM ET
NAICS code
237310
Contracting contact
Laura Slauter · CFLContracts@dot.gov

Original description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options. SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction. PRINCIPAL WORK ITE