Home / Concrete & Site Work

Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation

Due: 3 days leftPresolicitationOpen to allJM-02
What: Trenching, conduit installation, and ground-well work at U.S. Embassy compound. Work includes excavating trenches at multiple locations, installing PVC and steel conduit underground with proper backfill and compaction, and making connections to existing handholes. Contractor provides all labor, equipment, materials, and supervision. Period of performance: 21 days after contract award. Buyer: U.S. Department of State Where: United States Embassy, Kingston, Jamaica (Saint Andrew, JM-02) Deadline: October 26, 2026 at 2:00 p.m. Jamaica time. This is the deadline to express interest; formal bids will be requested later. Who can bid: Any responsible business may bid, including small businesses and large businesses. No set-asides or restrictions apply. Key requirements: Active registration in SAM.gov required. Insurance required. Defense-based Act (DBA) compliance required. Not stated in the notice summary: Bonding requirement, wage determination, licenses, past performance. Check before bidding: Full statement of work and detailed drawings; site visit requirements and dates. Next step: Email KingstonQuotes@state.gov before October 26, 2026 at 2:00 p.m. Jamaica time to express interest. Monitor SAM.gov for the formal solicitation.
Buyer
STATE, DEPARTMENT OF
Place of performance
Saint Andrew, JM-02
Response deadline
Monday, October 26, 2026 at 3:00 PM ET
NAICS code
238910
Contracting contact
U.S. Embassy Kingston Procurement Office · Kingston.quotes@state.gov

Original description

Description The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound. Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding. Trenching from Handholes The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings. Conduit Existing conduit shall remain in place unless the drawings specifically direct removal or modification. Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater. All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends. Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers . The Contractor shall install pull lines in all new conduit runs. Soil and Backfill Materials Soil Materials The Contractor shall provide all labor and materials for soil and backfill, where required. Select Backfill : ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter. Asphalt/Concrete Base Course : Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Base Gravel : Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Sand Cushion : ASTM C 33 fine aggregate, natural or manufactured sand. Placement and Compaction Place backfill and fill in layers not exceeding: 8 inches (203 mm) loose thickness for heavy compaction equipment; 4 inches (102 mm) loose thickness when compacted by hand-operated tampers. Place backfill and fill evenly to the required elevations, uniformly along their full length. Compact soil materials to not less than t