SLAC CUIR SP1 Master Substation Annex Building Construction

Due: 4 days leftSources SoughtOpen to allCA
What: Design-build construction of new Master Substation Building (B017S) at SLAC, including medium-voltage switchgear installation, generator relocation, substation replacement, busway installation, and 12kV cable reconnection. Estimated cost $12M–$17M. Work must maintain existing Building B016 operations throughout construction. Buyer: Department of Energy Where: Menlo Park, CA Deadline: October 26, 2026 at 5 pm PDT to respond to this Sources Sought notice Who can bid: Any company—large, small, or minority-owned—may express interest. This is not a bid competition yet. Key requirements: Bonding capacity required. Not stated in notice summary: insurance, licenses, wage determination, past performance. Check before bidding: (1) Full statement of work and specifications in draft RFP attachments. (2) Bonding requirements and insurance coverage limits. Next step: Email company name, contact person, phone, email, bonding capacity, and interest statement to quyen@slac.stanford.edu by October 26, 2026.
Buyer
ENERGY, DEPARTMENT OF
Place of performance
Menlo Park, CA, 94025
Response deadline
Tuesday, October 27, 2026 at 8:00 PM ET
NAICS code
236220
Contracting contact
Quyen Weng · quyen@slac.stanford.edu

Original description

THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist. SLAC CUIR SP1 MASTER SUBSTATION ANNEX BUILDING CONSTRUCTION DESCRIPTION This is a Sources Sought Notice to identify general contractors capable of building the planned Master Substation Annex Building work under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice. BACKGROUND Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs. CUIR is a project directly funded by the DOE's Office of Science. The project is organized into three subprojects to efficiently execute utility improvements in alignment with lab priorities and operational downtime schedules. PLANNED SCOPE AND DESCRIPTION OF SERVICES The project involves work inside the SLAC Master Substation Yard, adjacent to an existing Building B016 which serves as the control center for SLAC electrical power systems. Scopes under this contract includes: Construction of a new Master Substation Building (B017S) ; Installation of new medium-voltage switchgears (provided by SLAC as Government Furnished Property); Relocation of an existing generator; Replacement of an existing substation; Installation of new busways connecting existing and new tie breakers; and Reconnection of 12kV cables within existing substation building to the newly installed building. As the existing Building B016 s must remain functional throughout construction, the work must be carefully planned and coordinated to protect existing systems, maintain laboratory operations, and minimize electrical service interruptions. DRAFT REQUEST FOR PROPOSAL The Master Substation Annex Building has an estimated cost range of $12M to $17M. SLAC will use a Best Value Trade Off selection method to identify the most qualified design-build subcontractor. The draft Request for Proposal and relevant references are provided to present the general scope and acquisition method for the project. The draft documents provided are subject to change and should not be construed as a solicitation. This Sources S