Home / General Construction

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC

Due: 28 days leftSolicitationSDVOSBCPA
What: Replace two electrical substations (each 1500 kVA, 480/277V) at Philadelphia VA Medical Center. Install temporary substation during construction to keep facility operating. Work is phased to minimize service interruptions. Phase 1 only. Buyer: Department of Veterans Affairs Where: Philadelphia, Pennsylvania Deadline: November 20, 2026 Who can bid: Only businesses certified by the U.S. Small Business Administration (SBA) as Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through VetCert are eligible to bid. Key requirements: Not stated in the notice summary Check before bidding: (1) Full scope of work, detailed specifications, and drawings in bid documents; (2) All bonding, insurance, licensing, wage determination, and past performance requirements listed in complete bid package Next step: Email your proposal to Kevin Rodgers at kevin.rodgers2@va.gov by 4:00 p.m. Eastern Time on November 20, 2026. Request and review all bid documents before submitting.
Buyer
VETERANS AFFAIRS, DEPARTMENT OF
Place of performance
PA, 19104
Response deadline
Friday, November 20, 2026 at 4:00 PM ET
NAICS code
236220
Contracting contact
Kevin A Rodgers · kevin.rodgers2@va.gov

Original description

642-22-104, 36C24426R0088, Upgrade Substation Building 2, Phase 1, PHL CMCVAMC Proposal Due Date: 11/20/2026 at 4:00pm EST. Email proposals to Kevin Rodgers at kevin.rodgers2@va.gov. Corporal Michael J. Crescenz Medical Center (CMC VAMC) requires replacement of Electrical Substations 1 and 2 in order to increase electrical capacity to support future facility projects. The existing substations are approximately 29 years old and require replacement to support current and future electrical demands. This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service to the facility during demolition and construction activities. Upon completion of construction, the temporary substation shall remain installed as a spare substation for the facility. All work shall be phased to minimize service outages and maintain continuous operation of the medical center. Defined and issued bid documents (drawings and specifications) will serve as the basis of this construction project.