Home / Concrete & Site Work

ND NP THRO 204(1) Buck Hill Road

Due: 11 days leftSolicitationOpen to allND
What: Rehabilitation of Buck Hill Road (¾ mile) in Theodore Roosevelt National Park including roadway pulverization and new asphalt pavement, guardrail replacement, concrete curb and gutter, drainage work, deep subexcavation (1,000 linear feet, ~10 feet deep) to address landslide, and reconstruction of Buck Hill Overlook parking lot with expanded spaces for RVs and buses. Work includes 11,000 cubic yards subexcavation, 2,000 tons asphalt, 5,000 tons aggregate, 1,600 linear feet guardrail, concrete sidewalk, and signage. Construction April–November 2027. Estimated cost $5–10 million. Buyer: Federal Highway Administration Where: Medora, North Dakota (Theodore Roosevelt National Park, Billings County) Deadline: November 3, 2026 Who can bid: Any responsible business may bid, including large companies. No preference restrictions for small businesses. Key requirements: Not stated in the notice summary Check before bidding: (1) Full bonding and insurance requirements in the contract documents; (2) Geotechnical report specifications and any required site visit or pre-bid meeting dates Next step: Obtain the complete bid package and attachments from the Federal Highway Administration; review all technical specifications and submit your bid by November 3, 2026.
Buyer
FEDERAL HIGHWAY ADMINISTRATION
Place of performance
Medora, ND
Response deadline
Tuesday, November 3, 2026 at 4:00 PM ET
NAICS code
237310
Contracting contact
Kelly Palmer · cflacquisitions@dot.gov

Original description

INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – Apri