Home / General Construction

Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM

Due: 45 days leftSolicitationSDVOSBCNY
What: Site preparation and renovation of urology equipment rooms at Buffalo VA Medical Center. Work includes two Cystoscopy rooms (214, 215), Procedure Rooms (211, 212), control room (215-1), electrical room (214-1) with new panels, check-in area, office, vestibule, dressing area, toilet, and corridor. New medical equipment installation preparation. Estimated construction period: 720 days. Buyer: Department of Veterans Affairs Where: Buffalo, NY Deadline: December 7, 2026 Who can bid: Only Service-Disabled Veteran-Owned Small Businesses certified by the Small Business Administration (SBA VetCert). Other businesses are not eligible. Key requirements: Not stated in the notice summary Check before bidding: (1) Complete scope of work and detailed specifications in the Statement of Work attachment; (2) Bonding, insurance, wage determination, and licensing requirements in the full solicitation document Next step: Verify your SDVOSB certification status with SBA, then download and review the complete solicitation documents before submitting your bid by the deadline.
Buyer
VETERANS AFFAIRS, DEPARTMENT OF
Place of performance
Buffalo, NY, 14215
Response deadline
Monday, December 7, 2026 at 10:00 AM ET
NAICS code
236220
Contracting contact
Nicholas Winne · nicholas.winne@va.gov

Original description

The purpose of this project is to renovate two Cystoscopy rooms (214 and 215), Procedure Room (212), Procedure Room (211), Check-In area, Office, Control, Vestibule, Dressing, Toilet and Corridor. The two Cystoscopy rooms (214 and 215) will also receive new medical equipment. The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Period of Performance is estimated to be 720 days. This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Contractor shall prepare rooms 214 and 215 to receive new equipment. A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the design. In addition, Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area and restroom are included in this scope of work